Nestlewood Solar
This project involved comprehensive site preparation and infrastructure development across a vast area of 422 acres.
-
Client
The Ryan Company, Inc. -
Location
Hamersville, OH -
Architect
RRD Power & Energy (Engineer) -
Service Performed
Sitework Contractor -
Year Completed
2023







Key tasks included grading and clearing the land, electrical trenching, and establishing access roads, all of which are essential for ensuring efficient operations in the area. Additionally, a Storm Water Pollution Prevention Plan (SWPPP) was implemented to protect the environment during construction. This meticulous groundwork sets the foundation for future developments and helps maintain compliance with environmental regulations. A significant component of this project was the construction of 75 drilled foundations designed to support a switch yard and substation, integral to the electrical infrastructure. Covering an impressive 18,000,000 square feet, this expansive area will enable the installation of necessary electrical equipment, ensuring reliable power distribution for the region. The combination of thorough site preparation and robust foundational work positions this project for long-term success and sustainability, paving the way for the advancement of critical energy infrastructure.